13th March 2020

Inter-POP Optical Maintenance - March 28, 2020, scheduled 1 week ago

Please be advised that on Saturday, March 28, 2020 at 12:00pm US/Eastern time (16:00 UTC), PhillyIX will carry out an optical maintenance intended to expand capacity between our current points of presence. Members may experience intermittent connectivity to peers on the LAN, as we will be reconfiguring the physical connection between the Netrality MMR and Equinix PH1 locations. Peers connected at the Equinix PH1 location will experience a loss of connectivity to the route servers as well. We expect this entire maintenance to take 90 minutes (though actual downtime should be much less than that). We will provide updates on our status page. If you have questions or concerns, please feel free to contact our Admin team at admin@phillyix.net any time.